1200 tons of diabase hard rock production line equipment configuration
Raw material: diabase
Capacity requirement: 1200 tons/hour aggregate and machine-made sand;
Dust removal method: dry and wet combination, machine-made sand and fine aggregate washing
Use space: 70m×200m.
Concentrate specifications (mm) : 0 ~ 5 (sand), 5 ~ 10, 10 ~ 15, 15 ~ 20;
General specifications (mm) : 0 ~ 5 (sand), 5 ~ 10, 10 ~ 20, 20 ~ 30 (31.5);
Reserved specification (mm) : Railway slag (28 ~ 63 or 30 ~ 70)